Railway Bridge and Footbridge over the Gostynia Stream (Tychy–Pszczyna Route)
Railway Bridge and Footbridge over the Gostynia Stream (Tychy–Pszczyna Route)
Highlight • Bridge
Cycling
4.6
(295)
Gravel riding
5.0
(3)
Mountain biking
5.0
(1)
Tips
May 18, 2021
Cycling
August 24, 2024
Cycling
May 3, 2025
Cycling

Sign up for a free komoot account to get 8 more insider tips and takes.
Sign up for free
Nearby routes
Best routes near Railway Bridge and Footbridge over the Gostynia Stream (Tychy–Pszczyna Route)

4.8
(140)
801
riders
40.8km
02:30
150m
150m
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels.

4.8
(47)
260
riders
38.0km
02:30
130m
130m
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels.

4.8
(55)
240
riders
28.4km
01:50
110m
110m
Easy bike ride. Great for any fitness level. Mostly paved surfaces. Suitable for all skill levels.
Details
Informations
Elevation 300 m
Weather
Powered by Foreca
Today
Wednesday 1 July
26°C
16°C
36 %
Additional weather tips
Max wind speed: 14.0 km/h
Most visited during
January
February
March
April
May
June
July
August
September
October
November
December