BRIDGE BOW – Former Hielle station loop from Bussang
BRIDGE BOW – Former Hielle station loop from Bussang
4.8
(66)
360
riders
02:55
50.9km
230m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: May 13, 2026
Tips
Your route passes through a protected area
Please check local regulations for:
Waypoints
Start point
Bus stop
Get Directions
242 m
Highlight • Rest Area
Translated by Google •
Tip by
269 m
Highlight • Other
Translated by Google •
Tip by
6.31 km
Highlight • Other
10.2 km
Highlight • Monument
Translated by Google •
Tip by
18.7 km
Highlight • Cycleway
25.5 km
Highlight • Structure
Translated by Google •
Tip by
32.3 km
Highlight • Bridge
Translated by Google •
Tip by
47.2 km
Highlight (Segment) • Cycleway
50.9 km
End point
Bus stop
Way Types & Surfaces
Way Types
49.1 km
905 m
761 m
151 m
< 100 m
Surfaces
50.0 km
880 m
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Monday 18 May
13°C
2°C
70 %
Additional weather tips
Max wind speed: 13.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.