RoutesPlannerFeaturesUpdates
App
Login or Signup
Get the App
Login or Signup
Routes
Running trails & routes
United States
Massachusetts
Worcester County

Thayer Pond WMA – Thayer Pond loop from Barre Landfill

Routes
Running trails & routes
United States
Massachusetts
Worcester County

Thayer Pond WMA – Thayer Pond loop from Barre Landfill

Hard

4.7

(3213)

5,739

runners

Thayer Pond WMA – Thayer Pond loop from Barre Landfill

02:31

22.4km

140m

Running

Hard run. Very good fitness required. Mostly paved surfaces. Suitable for all skill levels.

Last updated: August 5, 2026

Tips

Your route passes through protected areas

Please check local regulations for:

Rutland State Park

Ware River Watershed

Waypoints

A

Start point

Get Directions

616 m

Ware river

Lake

2

1.11 km

Ware River Diversion Dam

Highlight • Monument

The Ware River Diversion Dam helps control the flow of water from the Quabbin Aqueduct into the Ware River. This is a really cool looking structure that you can see from the side of the trail.

Tip by

3

7.83 km

Rutland State Park

Highlight • Forest

Rutland State Park is a 300-acre state park that is home to Whitehall Pond and multiple hiking and biking trails.

Tip by

4

8.76 km

The Mass Central Rail Trail is a 59-mile paved trail that is planned to extend to 104 miles from Boston to Northampton.

Tip by

5

10.3 km

Thayer Pond WMA

Highlight • Lake

Thayer Pond WMA is a 131-acre outdoor playground with the Central Mass Rail Trail running through it. You can enjoy wildlife viewing, hunting, and fishing in this natural landscape. The …

Tip by

6

10.4 km

Thayer Pond WMA is a 131-acre outdoor playground with the Central Mass Rail Trail running through it. You can enjoy wildlife viewing, hunting, and fishing in this natural landscape. The …

Tip by

7

11.0 km

Thayer Pond

Highlight • Lake

Thayer Pond is a pretty big body of water for a pond, and it's just off the side of the Mass Central Rail Trail. You get good views of the …

Tip by

8

21.3 km

The Massachusetts Central Rail Trail is a long term project to create the longest multi-use path in New England. It was once a railroad, but it was put out of …

Tip by

B

22.4 km

End point

Loading

Way Types & Surfaces

Way Types

21.4 km

934 m

Surfaces

12.0 km

10.1 km

156 m

< 100 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation
Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Monday 12 October

21°C

8°C

0 %

Additional weather tips

Max wind speed: 15.0 km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save
Edit route
Download GPX
Move start point
Print
Share
Embed on a website
Report an Issue
Report restricted access

Nearby routes

Moderate

51

Mass Central Rail Trail

00:56h

8.99km

50m

Explore
RoutesRoute plannerFeaturesRedeem a voucherHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy