Coal Railway Trail – Harkortsee Railway Viaduct loop from Hagen-Oberhagen
Coal Railway Trail – Harkortsee Railway Viaduct loop from Hagen-Oberhagen
4.7
(132)
367
riders
03:48
58.3km
420m
Cycling
Hard bike ride. Good fitness required. You may need to push your bike for some segments of this route. The starting point of the route is accessible with public transport.
Last updated: June 20, 2026
Tips
Includes a segment in which cycling is not permitted
After 44.1 km for 170 m
Waypoints
Start point
Train Station
Get Directions
15.5 km
Südholz
Forest
18.2 km
Highlight • Bridge
Translated by Google •
Tip by
18.7 km
Highlight • Cycleway
Translated by Google •
Tip by
19.2 km
Highlight • Cycleway
Translated by Google •
Tip by
21.0 km
Highlight • Viewpoint
Translated by Google •
Tip by
28.0 km
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
31.7 km
Viewpoint
Viewpoint
39.3 km
Highlight (Segment) • Bridge
Translated by Google •
Tip by
41.4 km
Highlight • Viewpoint
Translated by Google •
Tip by
41.7 km
Highlight • Bridge
Translated by Google •
Tip by
45.9 km
Hengsteysee
Lake
58.3 km
End point
Train Station
Way Types & Surfaces
Way Types
26.7 km
10.9 km
9.42 km
7.27 km
2.73 km
1.05 km
332 m
Surfaces
36.0 km
7.72 km
6.43 km
3.68 km
3.45 km
1.11 km
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (260 m)
Lowest point (80 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Thursday 2 July
22°C
11°C
0 %
Additional weather tips
Max wind speed: 17.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Showing Translation
Confirms my decision to ride the bike until the motor gives up.
We took familiar paths via Garenfeld to the Ruhr Valley cycle path and down to Wengern.
From there, the Elbschetalweg up to Albringhausen.
Family reunion for my stepfather's 80th birthday in the old train station. …
Showing Translation
Showing Translation
Showing Translation
Showing Translation
Work is currently underway on the almost three kilometers between the Gevelsberg West S-Bahn station and Im Hedstück street in Silschede. The route represents the early third of three construction phases. After that, the second section, which …
Showing Translation
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free