Smeagol (ALT Trail) – Harmony Hill Covered Bridge loop from Downingtown
Smeagol (ALT Trail) – Harmony Hill Covered Bridge loop from Downingtown
4.8
(6318)
7,708
riders
01:42
19.8km
320m
Mountain biking
Moderate mountain bike ride. Good fitness required. The starting point of the route is accessible with public transport.
Last updated: October 14, 2026
Tips
Cycling is not permitted along parts of this route
After 16.7 km for 143 m
After 17.0 km for 183 m
Waypoints
Start point
Train Station
2.42 km
Highlight (Segment) • Trail
Tip by
9.23 km
Sugar's Bridge Nature Area
Nature Reserve
10.3 km
M. John Johnson Nature Area
Nature Reserve
11.7 km
Highlight • Bridge
Tip by
11.7 km
Highlight • Bridge
Tip by
18.9 km
Highlight • Rest Area
Tip by
19.8 km
End point
Train Station
Way Types & Surfaces
Way Types
11.3 km
2.69 km
2.26 km
1.33 km
1.16 km
789 m
282 m
Surfaces
6.32 km
5.96 km
4.48 km
2.02 km
1.04 km
Sign up to see more specific route details
Sign up for freeElevation
Highest point (160 m)
Lowest point (60 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Tuesday 3 November
21°C
4°C
0 %
Additional weather tips
Max wind speed: 12.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.