RoutesPlannerFeaturesUpdates
App
Login or Signup
Get the App
Login or Signup
Routes
United States
Washington
King County
Kirkland

Cross Kirkland Corridor – Bent Nails Art Installation loop from Juanita High School

Routes
United States
Washington
King County
Kirkland

Cross Kirkland Corridor – Bent Nails Art Installation loop from Juanita High School

Moderate

4.6

(3386)

6,933

riders

Cross Kirkland Corridor – Bent Nails Art Installation loop from Juanita High School

01:36

30.7km

190m

Gravel riding

Moderate gravel ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.

Last updated: August 27, 2026

Waypoints

A

Start point

Bus stop

Get Directions
1

3.65 km

Cross Kirkland Corridor

Highlight (Segment) • Cycleway

The Cross Kirkland Corridor is a 10-foot-wide trail made of crushed gravel; at some point it will be paved. Either way, it runs through Kirkland for almost 6 miles with …

Tip by

2

6.62 km

Kirkland Rotary Central Station

Highlight • Monument

Kirkland Rotary Central Station is a restored former railroad station along the Cross Kirkland Corridor, preserving its historic charm while serving as a community hub. The station features interpretive signs …

Tip by

3

8.44 km

Cross Kirkland Corridor

Highlight • Cycleway

Cross Kirkland Corridors is a paved path through Kirkland with a mix of parkland and urban scenery. Expect minimal traffic and enjoy a pleasant ride. At this point, there is a steep shortcut to Northeast 60th Street.

Tip by

4

12.5 km

Bent Nails Art Installation

Highlight • Monument

Fun artwork along the side of trail next to Eastside Light Rail Maintenance facility.

Tip by

5

20.4 km

The entirety of the Cross Kirkland Corridor trail is awesome for running, and the path connects to a bunch of other trails and parks. This section of the trail provides …

Tip by

6

22.3 km

Two benches with a gorgeous view of Seattle and Lake Washington.

Tip by

7

25.7 km

Cross Kirkland Corridor

Highlight (Segment) • Trail

The Cross Kirkland Corridor is a 10-foot-wide trail made of crushed gravel; at some point it will be paved. Either way, it runs through Kirkland for almost 6 miles with …

Tip by

B

30.7 km

End point

Bus stop

Loading

Way Types & Surfaces

Way Types

16.1 km

11.7 km

1.58 km

939 m

420 m

Surfaces

13.1 km

9.98 km

4.54 km

3.07 km

< 100 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation
Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Wednesday 7 October

19°C

12°C

0 %

Additional weather tips

Max wind speed: 9.0 km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save
Edit route
Download GPX
Move start point
Print
Share
Embed on a website
Report an Issue
Report restricted access

Nearby routes

Moderate

4.6

37

Tokul Creek Trestle – Snoqualmie Valley Trail loop from Carnation

01:39h

30.9km

220m

Explore
RoutesRoute plannerFeaturesRedeem a voucherHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy