Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Routes
Mountain biking trails
United States
Georgia
Cobb County

Mountainbike loop from Roundabout construction County Line and Old Stilesboro Rds

Routes
Mountain biking trails
United States
Georgia
Cobb County

Mountainbike loop from Roundabout construction County Line and Old Stilesboro Rds

Easy

3.4

(4)

68

riders

Mountainbike loop from Roundabout construction County Line and Old Stilesboro Rds

01:00

12.0km

70m

Mountain biking

Easy mountain bike ride. Great for any fitness level. Suitable for all skill levels.

Last updated: May 18, 2026

Waypoints

A

Start point

Get Directions

1

5.04 km

Technical Creek Crossing and Rock Garden

Highlight • Trail

This section of Voodoo Trail features both a challenging creek crossing and a technical rock garden that will keep riders on their toes.

Tip by

B

12.0 km

End point

Loading

Way Types & Surfaces

Way Types

10.2 km

1.34 km

259 m

128 m

< 100 m

Surfaces

10.2 km

1.50 km

219 m

< 100 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Tuesday 7 July

33°C

20°C

-- %

Additional weather tips

Max wind speed: -- km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Report restricted access

Description

If you're looking for a casual ride that prioritizes accessibility over technical challenge, the Mountainbike loop from Roundabout construction County Line and Old Stilesboro Rds offers an easy 7.4 miles (12.0 km) with just 215 feet (66 metres) of elevation gain, taking roughly 59 minutes. This route is less about traditional mountain biking and more about navigating an area undergoing significant development, ultimately providing improved access to Kennesaw Mountain National Battlefield Park.

What to expect on Mountainbike loop from Roundabout construction County Line and Old Stilesboro Rds

This route primarily involves multi-use paved paths in an area currently defined by ongoing road construction. While the immediate surroundings might be a bit of a work-in-progress, the improvements are designed to enhance cycling access, particularly towards Kennesaw Mountain National Battlefield Park. You can expect a smooth, easy ride suitable for families or those new to mountain biking, rather than technical singletrack. The highlight here is the future multi-use path tunnel, which will offer a safe passage for cyclists under the busy Stilesboro Road intersection, connecting you seamlessly to the park's scenic paved roads.

Planning your visit

Be aware that the area around the intersection of County Line and Old Stilesboro Roads is currently a major construction zone, with the Georgia Department of Transportation undertaking a large project. This includes widening Old 41 Highway and building new roundabouts, with completion expected in 2025. Stilesboro Road is also experiencing phased closures through late 2025 for water pipeline upgrades, so check local traffic advisories before you head out. Parking might be impacted by the construction, so plan to arrive early or be flexible with your starting point.

Trail details

  • Distance: 7.4 miles (12.0 km)
  • Elevation gain: 215 feet (66 metres)
  • Difficulty: easy
  • Estimated time: 59 minutes

Nearby routes

Easy

5.0

183

Blankets Creek: Dwelling, South & Van Michael Loops

01:48h

20.9km

160m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy