American Tobacco Trail – Fred G. Bond Metro Park loop from Durham
American Tobacco Trail – Fred G. Bond Metro Park loop from Durham
4.7
(8080)
14,133
riders
06:26
106km
570m
Cycling
Hard bike ride. Very good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: February 28, 2026
Tips
Includes a segment in which cycling is not permitted
After 44.0 km for 160 m
Waypoints
Start point
Train Station
Get Directions
24.7 km
Highlight (Segment) • Trail
Tip by
33.5 km
Highlight (Segment) • Cycleway
Tip by
48.2 km
Crabtree Creek Watershed Project Site 23
Forest
50.5 km
Highlight (Segment) • Lake
Tip by
52.0 km
Highlight • Trail
Tip by
63.2 km
Highlight • Rest Area
Tip by
64.2 km
Highlight • Rest Area
Tip by
65.7 km
Highlight • Bridge
Tip by
105 km
Highlight • Historical Site
Tip by
106 km
End point
Train Station
Way Types & Surfaces
Way Types
93.3 km
10.0 km
1.76 km
660 m
149 m
< 100 m
< 100 m
Surfaces
78.7 km
12.5 km
8.11 km
6.33 km
162 m
158 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (140 m)
Lowest point (70 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Wednesday 20 May
33°C
19°C
0 %
Additional weather tips
Max wind speed: 14.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.