Cuyahoga River Bridge – Boston Trailhead loop from Rockside
Cuyahoga River Bridge – Boston Trailhead loop from Rockside
2.7
(8)
21
riders
02:59
57.0km
120m
Gravel riding
Moderate gravel ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: July 19, 2026
Tips
Your route passes through protected areas
Please check local regulations for:
Waypoints
Start point
Train Station
3.23 km
Highlight • Historical Site
Tip by
10.4 km
Highlight • Bridge
Tip by
19.4 km
Highlight • Forest
Tip by
21.5 km
Highlight • Bridge
Tip by
28.5 km
Highlight • Natural
Tip by
38.5 km
Highlight • Bridge
Tip by
39.3 km
Highlight • Parking
Tip by
42.5 km
Highlight (Segment) • Trail
Tip by
57.0 km
End point
Train Station
Way Types & Surfaces
Way Types
31.8 km
23.4 km
1.63 km
160 m
Surfaces
28.4 km
23.3 km
3.44 km
1.79 km
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Monday 5 October
17°C
11°C
0 %
Additional weather tips
Max wind speed: 27.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.