Gold Brook Covered Bridge – Idletyme Brewing & PK Coffee loop from Waterbury-Stowe
Gold Brook Covered Bridge – Idletyme Brewing & PK Coffee loop from Waterbury-Stowe
3.3
(26)
27
riders
03:53
49.4km
710m
Cycling
Hard bike ride. Very good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: May 8, 2026
Waypoints
Start point
Train Station
Get Directions
18.6 km
Highlight • Bridge
Tip by
22.6 km
Highlight • Religious Site
22.8 km
Highlight • Rest Area
Tip by
26.5 km
Highlight • Rest Area
Translated by Google •
Tip by
27.2 km
Highlight • Cafe
Tip by
49.4 km
End point
Train Station
Way Types & Surfaces
Way Types
27.5 km
11.7 km
6.17 km
2.80 km
1.08 km
109 m
< 100 m
Surfaces
30.7 km
18.3 km
231 m
163 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (410 m)
Lowest point (130 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Tuesday 19 May
29°C
17°C
66 %
Additional weather tips
Max wind speed: 15.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.