Peter DeFazio Bridge – Greenway Bike Bridge loop from Eugene
Peter DeFazio Bridge – Greenway Bike Bridge loop from Eugene
3.4
(7)
51
runners
04:12
39.4km
110m
Running
Hard run. Very good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: April 20, 2026
Waypoints
Start point
Train Station
Get Directions
3.32 km
Highlight • Rest Area
Tip by
4.46 km
Highlight • Pub
Tip by
7.03 km
Highlight • Rest Area
Tip by
15.6 km
Highlight • Structure
Tip by
23.0 km
Eastgate Woodlands/Whilamut Natural Area
Nature Reserve
25.4 km
Highlight • Monument
Tip by
27.0 km
Highlight • Bridge
Tip by
29.9 km
Highlight • Bridge
Tip by
34.0 km
Highlight (Segment) • Trail
Tip by
39.4 km
End point
Train Station
Way Types & Surfaces
Way Types
26.8 km
5.43 km
2.78 km
2.76 km
1.68 km
Surfaces
22.5 km
6.26 km
5.62 km
2.62 km
1.82 km
602 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Tuesday 19 May
22°C
5°C
0 %
Additional weather tips
Max wind speed: 18.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.