Trail Bridge – Buno Road bridge loop from Kensington Metropark
Trail Bridge – Buno Road bridge loop from Kensington Metropark
4.8
(8708)
11,673
riders
03:24
45.0km
300m
Gravel riding
Moderate gravel ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is right next to a parking lot.
Last updated: May 30, 2026
Tips
Your route passes through protected areas
Please check local regulations for:
Proud Lake State Recreation Area
Waypoints
Start point
Parking
Get Directions
19.1 km
Highlight (Segment) • Trail
Tip by
24.9 km
Highlight • Bridge
Tip by
40.5 km
Highlight (Segment) • Trail
Tip by
44.5 km
Highlight • Bridge
Tip by
45.0 km
End point
Parking
Way Types & Surfaces
Way Types
17.4 km
11.2 km
6.06 km
5.84 km
4.55 km
Surfaces
29.3 km
5.61 km
3.78 km
3.74 km
2.68 km
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (330 m)
Lowest point (270 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Sunday 26 July
30°C
18°C
-- %
Additional weather tips
Max wind speed: -- km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free