Bridge into Golden – Picnic Rock, Red Rocks Park loop from Wheat Ridge / Ward Road
Bridge into Golden – Picnic Rock, Red Rocks Park loop from Wheat Ridge / Ward Road
4.8
(5219)
16,166
riders
05:49
104km
1,850m
Road cycling
Hard road ride. Very good fitness required. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.
Last updated: July 10, 2026
Tips
Includes a segment in which cycling is not permitted
After 81.2 km for 247 m
Waypoints
Start point
Train Station
Get Directions
6.50 km
Highlight • Historical Site
Tip by
7.60 km
Highlight • Bridge
Tip by
7.94 km
Highlight (Segment) • Trail
Tip by
10.1 km
Highlight • Gorge
Tip by
43.1 km
Highlight • Lake
Tip by
81.2 km
Highlight • Natural Monument
Tip by
81.6 km
Highlight • Viewpoint
Tip by
84.2 km
Highlight • Natural Monument
Tip by
104 km
End point
Train Station
Way Types & Surfaces
Way Types
50.8 km
23.1 km
18.2 km
11.3 km
495 m
< 100 m
< 100 m
Surfaces
76.6 km
26.8 km
343 m
225 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (2,490 m)
Lowest point (1,650 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Thursday 23 July
29°C
18°C
96 %
Additional weather tips
Max wind speed: 14.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
I always name rides after the highest point on the ride. This happens to be a point on the I70 biketrail between Genesee and Bergen Park. The (sh) means that it's a "shoulder summit", indicating that you can ride higher on pavement without having to descend more than 100m or 300ft.
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free