Magarge Dam – Thomas Mill Covered Bridge loop from Chestnut Hill East
Magarge Dam – Thomas Mill Covered Bridge loop from Chestnut Hill East
5.0
(6232)
10,819
riders
01:15
15.7km
220m
Mountain biking
Moderate mountain bike ride. Advanced riding skills necessary. The starting point of the route is accessible with public transport.
Last updated: August 23, 2026
Tips
Includes a very steep uphill segment
You may need to push your bike.
After 13.7 km for 135 m
Waypoints
Start point
Train Station
11.1 km
Highlight • Restaurant
Tip by
11.8 km
Highlight • Waterfall
Tip by
13.7 km
Highlight • Bridge
Tip by
15.7 km
End point
Train Station
Way Types & Surfaces
Way Types
8.12 km
5.30 km
2.16 km
< 100 m
< 100 m
< 100 m
Surfaces
6.00 km
5.26 km
2.14 km
1.18 km
1.06 km
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Highest point (130 m)
Lowest point (30 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Friday 27 November
13°C
4°C
84 %
Additional weather tips
There’s a fairly high chance of rain. Consider packing a waterproof jacket.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.