Old Erie Rail Trail (gravel) – Piermont Railway Station (historic) loop from Hillsdale
Old Erie Rail Trail (gravel) – Piermont Railway Station (historic) loop from Hillsdale
4.9
(1505)
13,106
riders
03:57
60.0km
390m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. The starting point of the route is accessible with public transport.
Last updated: November 17, 2026
Tips
Your route passes through protected areas
Please check local regulations for:
Waypoints
Start point
Train Station
13.2 km
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
22.5 km
Highlight (Segment) • Trail
Tip by
34.6 km
Highlight (Segment) • Trail
Tip by
35.2 km
Highlight • Trail
Tip by
35.4 km
Highlight • Trail
Tip by
36.7 km
Highlight • Trail
Tip by
37.4 km
Highlight • Trail
Tip by
47.0 km
Highlight • Historical Site
Translated by Google •
Tip by
60.0 km
End point
Train Station
Way Types & Surfaces
Way Types
24.6 km
18.6 km
7.79 km
6.04 km
2.90 km
197 m
Surfaces
26.6 km
18.4 km
7.81 km
6.91 km
277 m
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Highest point (50 m)
Lowest point (0 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Friday 27 November
13°C
6°C
47 %
Additional weather tips
There’s a fairly high chance of rain. Consider packing a waterproof jacket.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.