Bridge over the Zenne – New asphalt along the canal loop from Tubize
Bridge over the Zenne – New asphalt along the canal loop from Tubize
105
riders
02:23
51.7km
290m
Road cycling
Moderate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.
Last updated: May 14, 2026
Tips
The surface for a segment of your route may not be suitable
Some segments of your route comprise a surface that may not be suitable for your chosen sport.
After 5.81 km for 137 m
Waypoints
Start point
Train Station
Get Directions
8.64 km
Highlight • Bridge
Translated by Google •
Tip by
9.67 km
Highlight • Monument
Translated by Google •
Tip by
15.4 km
Highlight • Cycleway
Translated by Google •
Tip by
17.7 km
Highlight • Cycleway
Translated by Google •
Tip by
18.8 km
Highlight • Structure
Translated by Google •
Tip by
19.0 km
Highlight (Segment) • Cycleway
Tip by
51.7 km
End point
Train Station
Way Types & Surfaces
Way Types
18.3 km
16.3 km
16.0 km
723 m
447 m
< 100 m
Surfaces
33.6 km
17.1 km
519 m
302 m
154 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (80 m)
Lowest point (20 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Wednesday 20 May
22°C
9°C
0 %
Additional weather tips
Max wind speed: 11.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.